Embankment

Too few unplanned closures of this kind in June to August 2026 and the same months a year earlier to tell a change from luck: 0 against 1. How this is tested.

On record
5 closures since May 2025

In force today

1 closure of this kind is in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Llangollen CanalLock 6, Grindley Brook Locks to Bridge 31, New Mills Lift Bridge22 December 2025278

By canal

4 canals have had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
Tame Valley Canal2
Huddersfield Narrow Canal1
Leigh Branch (L&L Canal)1
Llangollen Canal1

Every closure on record

Showing 5 closures involving a embankment.

Period

Rank by

Population

Status

Duration

Cause

Asset affected

CRT reason

Region

5
closures
656
closure-days since May 2025
445
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
1
1
1
1
1
1
1
2
2
2
3
2
2
2
1
1
1
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
0
0
0
2
3
0
<=1d2-7d8-30d31-90d91-365d>365d
5 results · every closure involving a embankmentJump to list

Closures

  1. Between Lock 6 Grindley Brook Lock and Bridge 31A Whitchurch Bypass Bridge

    Llangollen CanalWest Midlands

    278 days

    From 22 December 2025

    No reopening date

    Still shut

    Where
    Lock 6, Grindley Brook Locks to Bridge 31, New Mills Lift Bridge
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Embankment

    Work has temporarily stopped on the reconstruction of the canal embankment due to unforeseen wet areas of material at the south (New Mills Lift Bridge) end of the works. The wet areas are preventing the imported granular material from being adequately compacted. The existing…

    Latest of 18 CRT updates, 14 September 2026. 12 days without another.

  2. Navigation Closure: Lock 11 West, Huddersfield Narrow Canal

    Huddersfield Narrow CanalNorth West

    212 days

    From 1 January 2025

    Reopened 1 August 2025

    92 of them since this archive began on 1 May 2025

    Where
    Lock 12 West to Lock 10 West
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Embankment

    We are pleased we have completed works to Lock 11W, from the extreme damaged that occurred in January. We will continue to demobilise the area and we will carry landscaping with reinstalling of trees. Please note this lock and all locks on the Huddersfield Narrow Canal will…

    Latest of 6 CRT updates, 30 July 2025.

  3. Spouthouse Embankment, Perry Barr, Birmingham

    Tame Valley CanalWest Midlands

    130 days

    From 3 November 2025

    Reopened 13 March 2026

    Where
    Culvert 3, Hampstead to Perry Barr Lock 1, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Embankment

    A navigation and towpath closure are required for significant canal bed replacement works to two areas of the canal over the length of Spouthouse Embankment. The canal will be drained between Gorse Farm Bridge and Tower Hill and works will also include canal wall rebuild and…

    CRT's only update, 8 May 2025.

  4. Poolstock Lock 1 to Bridge No.3, Bamfurlong Bridge

    Leigh Branch (L&L Canal)North West

    78 days

    From 12 August 2025

    Reopened 29 October 2025

    Where
    Lock 1, Top Lock, Leigh Branch to Bridge No.3, Bamfurlong bridge
    CRT reason
    3rd Party Works
    Cause
    Other cause
    Asset
    Embankment

    We are pleased to advise that the final checks have been completed to the washwall at Lock 1, Poolstock Lock and Bridge 3, Bamfurlong bridge on the Leigh branch on the Leeds & Liverpool canal and navigation is now back open.

    Latest of 8 CRT updates, 29 October 2025.

  5. Spouthouse Embankment, Perry Barr, Birmingham

    Tame Valley CanalWest Midlands

    78 days

    From 23 March 2026

    Reopened 9 June 2026

    Where
    Gorse Farm Bridge, Gorse Farm to Perry Barr Lock 1, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Embankment

    The navigation and towpath remain closed while we work with a third party to resolve the issue. We apologise for any inconvenience and will provide an update by 5 June.

    Latest of 6 CRT updates, 12 May 2026.

What fails · Canals · Reliability · Trends · Download data