Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Ripon Canal
Ripon Canal
Something was shut here on 38% of this cruising season — 87 of its 231 days — across 5 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
2 closures are still shut now, and 2 of those have no reopening date. Filter to them.
- Regions
- Yorkshire and North East
- On record
- 6 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 5 closures on the Ripon Canal.
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Closed - Oxclose Lock | Lock 3, Oxclose Lock | 2026-07-06 | 78 |
| Low water levels from Lock 1 to Lock 2 | Lock 1 / Rhodesfield Lock to Lock 2, Bellfurrows Lock | 2026-07-06 | 78 |
| Oxclose Lock - Reopened | Lock 3, Oxclose Lock | 2026-03-20 | 7 |
| Lock 1 Rhodesfield, Top lock, in Ripon | Lock 1 / Rhodesfield Lock | 2026-03-23 | 4 |
| Rhodesfield Lock to Canal Basin Ripon | Ripon Canal - 001 to Ripon Canal - 002 | 2026-09-13 | 1 |
Showing the 5 longest of 5. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| River Skell Feeder | 16 November 2026 | 4 days |
Not counted
Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.
| Notice | State | Started |
|---|---|---|
| River Skell Feeder | Published | 16 November 2026 |