Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Monmouthshire & Brecon Canal

Monmouthshire & Brecon Canal

7.5 closure-days per kilometre (95% range 6.8–8.3) — 425 days across 14 closures of this 56km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 31% of this cruising season — 72 of its 231 days — across 7 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

1 closure is still shut now, and 1 of those has no reopening date. Filter to it.

Regions
Wales and South West
On record
21 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 14 closures on the Monmouthshire & Brecon Canal.

14
closures
425
closure-days
86
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
0
0
0
1
1
0
3
3
3
3
3
0
0
2
1
4
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
Wales and South West42514
14 results · every closure on the Monmouthshire & Brecon CanalJump to table
NoticeExtentStartedDays
Canal bed inspections, Glan Usk
Inspections · Cause not stated
Bridge 120, Baylis Bridge to Bridge 125, Dyfnant Bridge2026-01-0567
Canal bed inspections, Lower Llangynidr
Inspections · Cause not stated
Bridge 125, Dyfnant Bridge to Bridge 129, Panteague2026-01-0567
Canal bed inspections, Cross Oak, Nr Talybont-on-Usk
Inspections · Cause not stated
Bridge 146, Chilson Bridge to Bridge 152, Castle Bridge2026-01-0567
Bridge 62, High Bridge, Mamhilad
Repair · Wear and tear
Bridge 62, High Bridge2025-11-0346
Canal bed inspections near Goytre
Inspections · Cause not stated
Bridge 75, Jenkin Rosser to Bridge.76 Lapstone2025-11-0346
Llanfoist Safety Gates (upstream and downstream), Embankment 8A, Llanfoist.
Repair · Other cause
Tod's Bridge to Bridge 96, Govilon Turn2025-11-0346
Bridge 47 to Bridge 55 on the Monmouthshire & Brecon Canal.
Repair · Wear and tear · no reopening date
Bridge 47, Solomon's Bridge to Bridge 55, Jockey Bridge2026-08-2528
Upstream of bridge 147 Cross oak
Vegetation · Weather
Bridge 147, Cross Oak2026-06-1324
Monmouthshire & Brecon Canal, downstream of Bridge 106 (Gilwern)
Vegetation · Weather
Bridge 106, Ffynnon-Yr-Eirin2025-08-2818
Bridge 55 M&B Canal
Repair · Wear and tear
Bridge 47, Solomon's Bridge to Bridge 55, Jockey Bridge2026-08-0915
Between Bridge 118 to Bridge 119, Monmouthshire & Brecon Canal
Vegetation · Weather
Bridge 118, Workhouse Bridge to Bridge 119, Folly Bridge2026-06-021
300m U/S of Brynich Lock
Vegetation · Weather
Bridge 163, Cefn Brynich Bridge to Br.164 Brynich Bridge2026-08-29same day
Between bridges 95A & 96
Vegetation · Weather
Llanfoist Stopgate D/S to Bridge 96, Govilon Turn2026-08-31same day
Below Bridge 79
Vegetation · Weather
Bridge 78, Mill Turn to Llanover Bridge 792026-09-05same day

Coming up

Scheduled but not yet started, so in no figure above.

7 scheduled.
ClosureFromPlanned
Canal channel - Mamhilad between Bridge 57, Lower Wern and Bridge 65, Mortimer`s
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Canal channel - Gilwern between Bridge 104, Auckland Bridge and 200m west of Bridge 109, Dan-Y-Parc
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Weir 2A, Llanfrynach weir
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Lock 69, Brynich Lock, Brynich, Brecon, Wales
Monmouthshire & Brecon Canal · Repair
9 November 202618 days
Glanusk. Between bridges 119 and 125
Monmouthshire & Brecon Canal · Repair
4 January 202767 days
Lock 65, Coombes Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days
Lock 69, Brynich Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

8 notices excluded from the figures.
NoticeStateStarted
Lock 66, CwmcrawnonCancelled9 February 2026
Canal channel - Mamhilad between Bridge 57, Lower Wern and Bridge 65, Mortimer`sPublished2 November 2026
Canal channel - Gilwern between Bridge 104, Auckland Bridge and 200m west of Bridge 109, Dan-Y-ParcPublished2 November 2026
Glanusk. Between bridges 119 and 125Published4 January 2027
Lock 69, Brynich Lock, Brynich, Brecon, WalesPublished9 November 2026
Weir 2A, Llanfrynach weirPublished2 November 2026
Lock 65, Coombes LockPublished11 January 2027
Lock 69, Brynich LockPublished11 January 2027