Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / South Dock

Bridge 1, Manchester Road Bridge

CRT cancelled this notice, so it never took effect. It is kept here because it was published, and it is excluded from every closure figure.

Source: this notice on canalrivertrust.org.uk

Waterway
South Dock
Region
London and South East
Started
2 March 2026
Status
cancelled
Days shut
CRT reason
Repair

What CRT said it was for

We are pleased to confirm that the principal inspections carried out on Manchester Road Bridge last week have progressed ahead of schedule. As the work has been completed earlier than planned, the stoppage previously scheduled for 2–6 March will no longer be required.

Where

Updates · 1

45 days with no update after the last one.

9 January 2026 · 0 days since the previous

A stoppage is required to carry out a principal inspection of the bridge. This will take place from 2–6 March, following an earlier stoppage scheduled for 16–20 February.

Cite this: Canal closures, “Bridge 1, Manchester Road Bridge”, https://crt-stoppages.pages.dev/notice/019ba367-fe6b-70fd-bb7c-cba07918ad05.

Every closure on South Dock · Download the data · Method and limits