Shipton Flood Gate

A navigation closure on the Oxford Canal, 19 December 2025 to 24 December 2025 — 5 days.

Source: this notice on canalrivertrust.org.uk

Waterway
Oxford Canal
Region
London and South East
Started
19 December 2025
Status
Reopened 24 December 2025
Days shut
5
CRT reason
High Water Levels
Cause
Weather
Asset
Sluice

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

What CRT said it was for

Risk of flooding receded

Where

Updates · 2

0 days with no update after the last one.

24 December 2025 · 5 days since the previous

Shipton Flood Gate is now open to navigation as the risk of flooding has receded. Please note that navigation remains closed at Shipton Lift bridge 219

19 December 2025 · 0 days since the previous

Please be advised that we've closed the shipton floodgates to protect nearby residential areas from the potential flooding.   Full details of closure affecting navigation can be found at the existing notice for Shipton.   [https://canalrivertrust.org.uk/notices/019b2186-b42c-7997-bb83-6d9102b1e8a6](https://canalrivertrust.org.uk/notices/019b2186-b42c-7997-bb83-6d9102b1e8a6 "https://canalrivertrust.org.uk/notices/019b2186-b42c-7997-bb83-6d9102b1e8a6")