Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Grand Union Canal

LK 56 Top Side Lock(pink house)

A navigation closure on the Grand Union Canal, 20 January 2026 to 21 January 2026 — 1 days.

Source: this notice on canalrivertrust.org.uk

Waterway
Grand Union Canal
Region
London and South East
Started
20 January 2026
Status
Reopened 21 January 2026
Days shut
1
CRT reason
Maintenance
Cause
Wear and tear
Asset
Lock

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

Where

Updates · 1

47 days with no update after the last one.

5 December 2025 · 0 days since the previous

Our Regional Reactive and Asset teams have identified leakage through ground paddle frames that are causing water loss and water resource issues, resulting in regular low levels in the pound between locks 55 and 56. A lock head dewatering with stop plank installation will be required to inspect and repair leakage through both ground paddle frames. Navigation closure starting at Lock 55 for safety and water control purposes. Stoppage starts at Lock 55 and ends at Lock 56, tow path remains open

Cite this: Canal closures, “LK 56 Top Side Lock(pink house)”, https://crt-stoppages.pages.dev/notice/019aee4b-067b-7975-97db-dd7eadd61e91.

Every closure on Grand Union Canal · Download the data · Method and limits