Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
Between Belgrave Lock 44 and Limekiln Lock 43
A navigation closure on the River Soar, 3 September 2025 to 4 September 2025 — 1 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- River Soar
- Region
- East Midlands
- Started
- 3 September 2025
- Status
- Reopened 4 September 2025
- Days shut
- 1
- CRT reason
- Low Water Levels
- Cause
- Cause not stated
- Asset
- Canal or river
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
Water levels have returned to normal and this section of the River Soar is now open.
Where
- River Soar: Lock 43 - Limekiln Lock to Lock 44 - Belgrave Lock
Updates · 1
1 days with no update after the last one.
3 September 2025 · 0 days since the previous
Due to low water levels between Belgrave Lock 44 https://w3w.co/agent.oath.robe and Limekiln Lock 43 https://w3w.co/clever.mint.blast we have had to temporarily close this section of the River Soar. We will update this notice as soon as we have further information.
Cite this: Canal closures, “Between Belgrave Lock 44 and Limekiln Lock 43”, https://crt-stoppages.pages.dev/notice/01990f0c-e14d-77fa-82a6-bb437a5cfd82.
Every closure on River Soar · Download the data · Method and limits