Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
Bridge 163
A navigation closure on the Oxford Canal, 24 May 2025 to 28 May 2025 — 4 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Oxford Canal
- Region
- London and South East
- Started
- 24 May 2025
- Status
- Reopened 28 May 2025
- Days shut
- 4
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
Tree cleared by contractors
Where
- Oxford Canal: Bridge 163, Marsh Bridge to Bridge 163, Marsh Bridge
Updates · 1
4 days with no update after the last one.
24 May 2025 · 0 days since the previous
A tree has fallen close to Bridge 163 (Marsh Bridge) blocking navigation. Contractors will need to remove this obstruction and have been instructed to attend.
Cite this: Canal closures, “Bridge 163”, https://crt-stoppages.pages.dev/notice/019701ba-03dc-7119-8c60-86b61a20784b.
Every closure on Oxford Canal · Download the data · Method and limits