0.7 closure-days per kilometre (95% range 0.3–1.0) — 15 days across 3 closures of this 22km canal.
Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.
Something was shut here on 7% of this cruising season — 16 of its 231 days — across 2 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
Nothing is shut on this canal today.
- Regions
- London and South East
- On record
- 3 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 3 closures on the Paddington Arm (Grand Union Canal).
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Fallen tree east of Bridge 11 | Bridge 11, Ealing Road (A4005) to Bridge 11A, Railway (Underground) | 2026-06-24 | 14 |
| GP-016-010 | Bridge 9, Acton Lane (B4492) to Bridge 8C (Railway) | 2026-01-11 | 1 |
| Navigation Closure - Paddington Arm (Grand Union Canal), Hormead Wharf, Paddington | Paddington Arm (Grand Union Canal) - 020 | 2026-09-04 | same day |